SAMPLE IN 7 DAYS · BULK IN 14-21

Know your delivery date
before you order.

Backper lead times are committed, not estimated. Every quote carries a guaranteed ship date backed by buyer protection. Use the estimator to see realistic timing for your category, quantity and shipping method.

7 days Sample turnaround
96% On-time vs. committed date
14-21d Typical bulk lead time

LEAD-TIME ESTIMATOR

Your delivery date

LIVE ESTIMATE

PRODUCT TYPE

QUANTITY

SHIPPING

22 days
EST. DELIVERY
Sample · 4d Tooling · 3d Production · 9d Ship · 6d

Committed dates are guaranteed — late without cause earns an auto shipping credit.

/ WHERE THE DAYS GO

Every order moves through five stages.

A typical 1,000-unit custom order, broken down stage by stage.

3-5d

Sampling

Pre-production sample made and shipped for your sign-off.

2-4d

Tooling & setup

Cutting dies, screens and embroidery files prepared for the run.

7-12d

Bulk production

Cut, sew and assemble the full quantity across the line.

1-2d

QC & pack

Inspection against tech pack, photos, and export packing.

3-24d

DDP transit

Air in days or sea in weeks — duties and customs handled.

Order placed Production: ~14 days Delivered

/ BY CATEGORY

Typical lead times across the catalog.

Need it faster? →
CATEGORY
SAMPLE
IN-CATALOG BULK
CUSTOM BUILD
School & campus
5d
12-14d
18-21d
Hiking & outdoor
7d
14-18d
21-28d
Travel & cabin
7d
14-18d
21-26d
Business & laptop
6d
12-16d
20-24d
Tactical & EDC
8d
16-21d
26-34d
Kids & junior
5d
12-15d
18-22d
Custom & branded
8d
24-35d

Production days only — add 3-24 days for DDP transit depending on air vs. sea.

/ WHAT MOVES THE DATE

The big levers on your timeline.

Customization depth

A catalog restyle ships fast. New patterns, custom hardware or fabric dye-to-match add tooling and sampling time.

+ +6-14 days for custom builds

Order quantity

Bigger runs need more line time, but per-unit speed improves. 50k units isn't 50x the days of 1k.

+ +2-8 days above 1,000 units

Shipping method

The single biggest variable. Express air clears in days; ocean freight is cheaper but adds weeks of transit.

− Air saves ~18 days vs. sea

Sample approvals

The clock pauses while we wait on your sign-off. Fast feedback on the pre-production sample is the easiest day to save.

− Same-day approval saves 2-4d

Season & capacity

Q3 pre-holiday and back-to-school peaks tighten factory capacity. Book early to lock your slot.

+ +3-7 days in peak season

Artwork readiness

Print-ready vector files move straight to tooling. Anything we have to redraw or re-color adds a round trip.

− Clean files save 1-3 days

/ NEED IT SOONER

Three ways to compress the timeline.

How rush works →

Stock & ship

3–5 days

No premium · in-catalog only

  • Ready-made styles from regional stock
  • Logo printing added in 1–2 days
  • Best for reorders & tight launches
MOST POPULAR

Priority production

8–12 days

+12% rush fee · most categories

  • Front-of-line factory slot
  • Parallel tooling & sampling
  • Air DDP included to one warehouse

Express air upgrade

+0 prod days

Freight cost only · any order

  • Swap sea for air on a normal build
  • Cuts ~18 days of transit
  • Door-to-door DDP, duties handled

/ LEAD-TIME FAQ

Timing questions, answered.

How dates are committed, what starts the clock, and where you can buy back time.

Ask about your timeline
01

Are your lead times guaranteed?

Yes. Every quote carries a committed ship date, not a vague estimate. If we miss it without a documented cause (force majeure, your own approval delays), you get an automatic shipping credit under buyer protection.

02

When does the clock start?

Production time begins once two things are done: your deposit clears escrow and you’ve approved the pre-production sample. Until then, sampling runs but the bulk clock is paused.

03

How fast can I get a sample?

Most catalog samples ship in 5–7 days; fully custom builds take up to 8. We send tracking the moment it leaves the floor, and sample cost is credited back when you place a bulk order within 90 days.

04

Why is sea freight so much slower?

Ocean transit itself is 18–35 days depending on lane, plus port handling and customs. It’s dramatically cheaper per unit, so it’s the default for large, non-urgent orders. Air DDP cuts transit to 3–6 days for a higher freight cost.

05

Do lead times change in peak season?

They can. Back-to-school (Q2) and pre-holiday (Q3) tighten factory capacity and may add 3–7 days. We flag it on your quote and recommend booking your production slot early to lock current timing.

06

Can I split delivery to hit a deadline?

Often, yes. We can air-freight a first tranche to cover a launch while the balance follows by sea — you get goods on shelf fast without paying air rates on the whole order. Ask your rep to structure it.

/ ON A DEADLINE

Got a hard ship date? Tell us up front.

Send your in-store or launch date and we'll work backward — picking the production lane, shipping method and rush option that lands your goods on time.